TABLE OF CONTENTS
EXECUTIVE SUMMARY
CHAPTER 1 - INTRODUCTION
1.1 Purpose
1.2 Scope of Plan
1.3 Goals and Objectives
CHAPTER 2 - PHASE II SYSTEM ASSESSMENT
2.1 General
2.2 Hydrology
  Table 2A Runoff Coefficients, C
2.3 System Issues
  Table 2B Phase II Pipe Totals
2.4 Conclusions
CHAPTER 3 - RECOMMENDATIONS
3.1 General
3.2 System Upgrades
  Table 3A - Pipe Upgrades
3.3 Capital Improvements
  Table 3B - Preliminary Opinion of Probable Cost, Phase II
APPENDICES
A. Figure A Phase II Basin Mapping
  Figure B Overall City Basin Mapping
B. Basin 10 Modeling Results and Recommendations
  Figures:
  Figure 10-1 Aerial Photo of Basin
  Figure 10-2 Basin with Zoning & Contours
  Figure 10-3 System Layout with Labeling
  Tables:
  System Summary Legend
  Table 10-1 System Summary
  Table 10-2 Existing Pipe Totals
  Table 10-3 Recommended Trunk Line Improvements
  Table 10-4 Preliminary Opinion of Probable Cost
  Table 10-5 All Undersized Pipes
  Table 10-6 Basin Points
C. Basin 11 Modeling Results and Recommendations
  Figures:
  Figure 11-1 Aerial Photo of Basin
  Figure 11-2 Basin with Zoning & Contours
  Figure 11-3 System Layout with Labeling
  Tables:
  System Summary Legend
  Table 11-1 System Summary
  Table 11-2 Existing Pipe Totals
  Table 11-3 Recommended Trunk Line Improvements
  Table 11-4 Preliminary Opinion of Probable Cost
  Table 11-5 All Undersized Pipes
  Table 11-6 Basin Points
D. Basin 12 Modeling Results and Recommendations
  Figures:
  Figure 12-1 Aerial Photo of Basin
  Figure 12-2 Basin with Zoning & Contours
  Figure 12-3 System Layout with Labeling
  Tables:
  System Summary Legend
  Table 12-1 System Summary
  Table 12-2 Existing Pipe Totals
  Table 12-3 Recommended Trunk Line Improvements
  Table 12-4 Preliminary Opinion of Probable Cost
  Table 12-5 All Undersized Pipes
  Table 12-6 Basin Points
E. Basin 13 Modeling Results and Recommendations
  Figures:
  Figure 13-1 Aerial Photo of Basin
  Figure 13-2 Basin with Zoning & Contours
  Figure 13-3 System Layout with Labeling
  Tables:
  System Summary Legend
  Table 13-1 System Summary
  Table 13-2 Existing Pipe Totals
  Table 13-3 Recommended Trunk Line Improvements
  Table 13-4 Preliminary Opinion of Probable Cost
  Table 13-5 All Undersized Pipes
  Table 13-6 Basin Points
F. Basin 14 Modeling Results and Recommendations
  Figures:
  Figure 14-1 Aerial Photo of Basin
  Figure 14-2 Basin with Zoning & Contours
  Figure 14-3 System Layout with Labeling
  Tables:
  System Summary Legend
  Table 14-1 System Summary
  Table 14-2 Existing Pipe Totals
  Table 14-3 Recommended Trunk Line Improvements
  Table 14-4 Preliminary Opinion of Probable Cost
  Table 14-5 All Undersized Pipes
  Table 14-6 Basin Points
G. Phase II Additional Data
  Table G-1 All Points Listing
  Table G-2 Unused Points Listing


For more information please Contact our Staff.

Stormwater Management Plan - Phase II

UPCOMING EVENTS

City of Kelso 360.423.1371
203 South Pacific, Kelso, WA 98626
Stormwater Management Plan - Phase II
Copyright City of Kelso, Washington. City of Friendly People.
Web site by omOriginals Marketing!