| TABLE OF CONTENTS |
| EXECUTIVE SUMMARY |
| CHAPTER 1 - INTRODUCTION |
| 1.1 |
Purpose |
| 1.2 |
Scope of Plan |
| 1.3 |
Goals and Objectives |
| CHAPTER 2 - PHASE II SYSTEM ASSESSMENT |
| 2.1 |
General |
| 2.2 |
Hydrology |
| |
Table 2A Runoff Coefficients, C |
| 2.3 |
System Issues |
| |
Table 2B Phase II Pipe Totals |
| 2.4 |
Conclusions |
| CHAPTER 3 - RECOMMENDATIONS |
| 3.1 |
General |
| 3.2 |
System Upgrades |
| |
Table 3A - Pipe Upgrades |
| 3.3 |
Capital Improvements |
| |
Table 3B - Preliminary Opinion of Probable Cost, Phase II |
| APPENDICES |
| A. |
Figure A Phase II Basin Mapping |
| |
Figure B Overall City Basin Mapping |
| B. |
Basin 10 Modeling Results and Recommendations |
| |
Figures: |
| |
Figure 10-1 Aerial Photo of Basin |
| |
Figure 10-2 Basin with Zoning & Contours |
| |
Figure 10-3 System Layout with Labeling |
| |
Tables: |
| |
System Summary Legend |
| |
Table 10-1 System Summary |
| |
Table 10-2 Existing Pipe Totals |
| |
Table 10-3 Recommended Trunk Line Improvements |
| |
Table 10-4 Preliminary Opinion of Probable Cost |
| |
Table 10-5 All Undersized Pipes |
| |
Table 10-6 Basin Points |
| C. |
Basin 11 Modeling Results and Recommendations |
| |
Figures: |
| |
Figure 11-1 Aerial Photo of Basin |
| |
Figure 11-2 Basin with Zoning & Contours |
| |
Figure 11-3 System Layout with Labeling |
| |
Tables: |
| |
System Summary Legend |
| |
Table 11-1 System Summary |
| |
Table 11-2 Existing Pipe Totals |
| |
Table 11-3 Recommended Trunk Line Improvements |
| |
Table 11-4 Preliminary Opinion of Probable Cost |
| |
Table 11-5 All Undersized Pipes |
| |
Table 11-6 Basin Points |
| D. |
Basin 12 Modeling Results and Recommendations |
| |
Figures: |
| |
Figure 12-1 Aerial Photo of Basin |
| |
Figure 12-2 Basin with Zoning & Contours |
| |
Figure 12-3 System Layout with Labeling |
| |
Tables: |
| |
System Summary Legend |
| |
Table 12-1 System Summary |
| |
Table 12-2 Existing Pipe Totals |
| |
Table 12-3 Recommended Trunk Line Improvements |
| |
Table 12-4 Preliminary Opinion of Probable Cost |
| |
Table 12-5 All Undersized Pipes |
| |
Table 12-6 Basin Points |
| E. |
Basin 13 Modeling Results and Recommendations |
| |
Figures: |
| |
Figure 13-1 Aerial Photo of Basin |
| |
Figure 13-2 Basin with Zoning & Contours |
| |
Figure 13-3 System Layout with Labeling |
| |
Tables: |
| |
System Summary Legend |
| |
Table 13-1 System Summary |
| |
Table 13-2 Existing Pipe Totals |
| |
Table 13-3 Recommended Trunk Line Improvements |
| |
Table 13-4 Preliminary Opinion of Probable Cost |
| |
Table 13-5 All Undersized Pipes |
| |
Table 13-6 Basin Points |
| F. |
Basin 14 Modeling Results and Recommendations |
| |
Figures: |
| |
Figure 14-1 Aerial Photo of Basin |
| |
Figure 14-2 Basin with Zoning & Contours |
| |
Figure 14-3 System Layout with Labeling |
| |
Tables: |
| |
System Summary Legend |
| |
Table 14-1 System Summary |
| |
Table 14-2 Existing Pipe Totals |
| |
Table 14-3 Recommended Trunk Line Improvements |
| |
Table 14-4 Preliminary Opinion of Probable Cost |
| |
Table 14-5 All Undersized Pipes |
| |
Table 14-6 Basin Points |
| G. |
Phase II Additional Data |
| |
Table G-1 All Points Listing |
| |
Table G-2 Unused Points Listing |